TOP

Author Archive | amyyang

Facility Notice

Dear all,

Any classroom laundry requests during this coming summer holiday, please fill a yellow form by the day before Last day of school finish ( Jun 20th).

Thanks for cooperation.

Facility Department

Facility Notice

Fire alarm and linkage control system test & Lock down-Blue lighting and sound system integration test by authorised testing party this Sunday.

Time: 9:00am to 12:00am, Sunday (Jun 2nd)

Scope: Whole school

Please be informed, and thanks for support and cooperation!

Facility Department

Facility Notice

Blue lighting and sound system integration test with whole buildings for EY project,

May 15th (Wed) from 4:30pm to 6:30pm .

Thanks for your understanding.

Facility Department

Facility Notice

Section-C Power off as EY project needs:

This Sunday (Apr-14th)  from 1:00pm to 5:00pm.

 

Thanks for your understanding.

Facility Department

Facility Notice

During Apr break:
1. Main building-Green Gym close for maintenance: Apr 1st & Apr 4th from 8:00am to 3:00pm.
2. Alarming system testing around whole school area (Fire drill & Lock down) : Apr 4th whole day.

Thanks for your cooperation.

Facility Department

Facility Notice

During Apr break:
1. Main building-Green Gym close for maintenance: Apr 1st & Apr 4th from 8:00am to 3:00pm.
2. Alarming system testing around whole school area (Fire drill & Lock down) : Apr 4th whole day.

Thanks for your cooperation.

Facility Department

Facility Notice

The sliding door at main entrance of The Centre is not working properly. We’ve already contacted the supplier come to replace the broken fittings ASAP. Please use the side doors. Thanks.

Facility Department

Facility Notice

Car parking area will be closed on this Sunday (Nov 25th) whole day for repainting the lines on the ground.

Thanks for your cooperation.

Facility Department

Facility Notice

1.Please fill yellow form if your classroom need special maintenance about cleaning, laundry, plants watering and fish feeding during winter break;

2.Due to the annual maintenance of bicycle and motorbike parking, this area will be closed in winter holiday. Any bicycles and motorbikes left in this area after 19 Dec 2018 will be disposed of. Please collect your bicycle or motorbike before that date.

Thanks.

Facility Department

Facility Notice

One outer window of mandarin classroom B155 was broken, and checked with supplier, we need to take down whole window with frame together to remake and install new glass, at least one week. So we have to put the work off until winter break. Picture attached for details. Please keep away for safety.

Facility Department

Facility Notice

 

One glass door at PAC 1st floor next to the lift is broken. We took down the door and will fix it back right after the glass be fixed.

Facility Department

Facility Notice

  1. This Weekend, Green Gym will be closed from Saturday (20th) 14:00pm to Sunday (21st) 15:00pm for drawing lines on the floor.

Facility Notice

Dear all,

Informed by the Power Bureau that there will be a power preventive testing on Oct. 4th in school. The testing will start at 8AM and last for about 8 hours. There will be 3 power-cuts during the day, half an hour each.

Thanks for your cooperation.

Facility Department

Power Off on Oct 4th

Dear all,

Informed by the Power Bureau that there will be a power preventive testing on Oct. 4th in school. The testing will start at 8AM and last for about 8 hours. There will be 3 power-cuts during the day, half an hour each.

Regards

Facility Department

Notices from Facility

Dear all,

  1. Preventive testings: We will do preventive testings about bell system, PA system and Blue lights on Sep 18th 20:00pm around whole school area.
  2. Back access to Cafeteria is unblocked, the glass ceiling been fixed already.

Kind Regards.

Facility Department

Powered by WordPress. Designed by Woo Themes

Subscribe By Email

Please prove that you are not a robot.

Skip to toolbar